In the process of testing the 2019 rollover event, the Orolia Engineering department has determined that this year’s event will potentially affect a limited volume of equipments embedding a Trimble Lassen IQ receiver, despite a Rollover week event compliant notice from the vendor. As a result, the time code may be affected but the GPS will remain locked. The following products have been identified: EC20S, EC22S.
Date: 
Wednesday, March 13, 2019
Product Family and Model: