The following operational checks of the Path Align-R™ may be made by personnel in the field to confirm proper operation of both Path Align-R™ units, their coax cables and the waveguide adapters (transitions). This confirmation may be made prior to climbing the towers or whenever an operational confidence check needs to be made in the field, without access to test equipment or electronic technicians.
pdf - 345 KB
Date: 
Thursday, May 3, 2012